Work Party Update – 6th September 2016

Tonight the new fleur de lie was fitted and painted red on the front door. A knob was fitted to the bell rope door. Bubbled paint in the entrance vestibule was sanded down and undercoated.…

Work Party Update – 30th August 2016

Tonight, we fitted an emergency red light outside the new disabled toilet. The main front doors were sanded down and the dummy hinges were sanded and de-rusted. An undercoat of white hammerite was applied.…

Work Party Update – 23rd August 2016

We fixed the handle on the disabled toilet door in the hall which had been broken. The outside box was fixed to the wall to insulate the pipework of the new disabled toilet. We also fitted a new mirror and tiles at the sink of the new toilet as well as touching up the paintwork.…

Work Party Update – 16th August 2016

Over the summer period the new disabled toilet has been fitted and all pipework has been plumbed in. Tonight, we boxed around some external pipework to protect it from frost in the winter and we attached the towel rail and toilet roll holder to the wall of the new toilet.…

Work Party Update – 12th July 2016

We finished the painting of the walls in the new toilet.…

Work Party Update – 21st June 2016

Tonight we plastered the wall at the half landing. The wall in the new disabled toilet was sanded flat and further undercoating done. A new catch (vacant/engaged) was fitted.…

Work Party Update – 14th June 2016

Tonight we did some plastering in the bell tower. We fitted the last two pieces of wood on the new toilet ceiling. We also fitted a piece of plywood behind the bell pull rope to prevent the rope getting dirty. The fraying rope was whipped to prevent further fraying and the loose ends were cut off. Old wormed wood was cut up and taken to the tip.…

Work Party Update – 7th June 2016

We finished the ceiling in the new disabled toilet and have started repositioning the bell pull.…

Work Party Update – 31st May 2016

Outside we completed the cement work and replaced all the grass turfs that had been lifted to lay the pipework for the new toilet. In the new toilet more work was done on the ceiling and the lights were fitted.…

Work Party Update – 24th May 2016

We started to repair the path to the back door after the trench was filled in. We continued to put a ceiling in to the new toilet. As there was not enough old wood, new wood was bought. The decision was taken to remove the old wood we started using for it all to be replaced with new wood.…