  1. Work Party Update – 2nd April 2019 — April 7, 2019
  2. Work Party Update – 26th March 2019 — April 7, 2019
  3. Work Party Update – 19th March 2019 — April 7, 2019
  4. Work Party Update – 12th March 2019 — April 7, 2019
  5. Work Party Update – 5th March 2019 — April 7, 2019

Author's posts listings

Work Party Update – 22nd May 2018

The two pillars were cleaned of rust and painted. The minister’s parking space strip marking was re painted and the work party’s cupboard was partially cleared out.…

Work Party Update – 15th May 2018

Tonight we completed the repair to the floorboards to the right hand side of the pulpit.…

Work Party Update – 8th May 2018

This evening, a vent outside the church which had become loose was secured back onto the building. We lifted a floorboard in the church to investigate a dip in the flooring which turned out to be a small bridge of wood over a heating pipe which needed replaced. Work was finished on the re-painting of the disabled toilet in the belfry.…

Work Party Update – 1st May 2018

The disabled toilet at the front of the Church was painted this evening. If a 2nd coat is required, that will be undertaken next week.…

Work Party Update – 24th April 2018

The scraping of paint in the belfry has been completed and PVA base coat applied. It is now ready for painting. New lock also fitted to the counting house door. …

Work Party Update – 17th April 2018

All the hall windows have now been scraped, washed and painted. We have started scraping the paint in the disabled toilet in the belfry.…

Work Party Update – 10th April 2018

Tonight we painted 1 1/2 of the windows in the large hall. The final window was washed down. The counting house door lock was examined and a new part is to be obtained.…

Work Party Update – 13th March 2018

After several weeks of scraping the wood of the windows in the hall, tonight we painted the first two.…

Work Party Update – 13th February 2018

The work party scraped the sandpapered the first 4 windows in the hall. The first 2 are now ready for painting.…

Work Party Update – 6th February 2018

This evening we demolished the electric organ and the 2 old lecterns on the small hall stage.…